Our Services

Pre-heating, post-heating and welding services

Electrical Pre-heating is provided by applying an electrical heat element on the outside body of casing and wellhead as per approved WPSs & PQRs based on API & ASME standards to ensure uniformly and steady distribution of heating for the base metal before& during welding to prevent cracking and maintain the mechanical prosperities for casing & flange material. Welding service is provided by approved WPSs & PQRs as per ASME standards with experienced 6gr welders, calibrated SMAW machines.
Post-heating is provided by applying an electrical heat element on the outside body of casing and wellhead as per approved WPSs & PQRs based on API & ASME standards for critical grades to prevent cracking and making stress relief by digitally controlling the heating, cooling rates and holding time.

EWA Certificate


More ...

Ceramic Pad Heater


More ...